.jpg)
We are an engineering company specializing in the comprehensive implementation of investments in the field of waste management and environmental protection
We offer comprehensive design and implementation services for environmental investments throughout the country.

.jpg)


In waste management projects, the most costly mistake is often made before the first excavator even arrives on the construction site. Poorly chosen technology, inconsistent environmental documentation, an underestimated timeline for approvals, or a design whose assumptions do not align with subsequent operation can delay the project by months and generate costs many times greater than the savings achieved during the preparation phase. That is why a sound investment begins with the integration of technology, paperwork, design, and construction as early as the conceptual phase.

Residents’ complaints about odors, an ever-increasing stream of biowaste, difficulties in maintaining stable process parameters, and a facility that was supposed to last for years but is now operating at the limits of its capacity. This is a scenario that both a large waste treatment facility and a smaller municipal utility might face. In such a situation, the problem should not be reduced solely to the question: “How do we eliminate the odor?” The key question is: What in the biological process has stopped functioning optimally, and how can we regain control over the entire facility?
AK NOVA is a Polish engineering company engaged in consulting, design and execution of works in the waste management sector. We specialize in the turnkey implementation of the NOVA-KOMP system composting plant, which is the first fully Polish technology realized from scratch and implemented on an industrial scale. We are one of the few companies in our country that can successfully complete the entire investment process from concept, through the design, construction, technological phase, up to commissioning, training of the crew and obtaining all necessary decisions and permits